This video is to demostrate :
1. Concatenation of columns/strings in Power Center mapping.
2. Add spaces between the concatenating column in output port.
3. Ignore Null columns.
How to automate the repository and domain back up process for disaster recovery in PowerCenter
How to find in which host the Repository Integration service is running in a multi node domain
How to unassign services from an expired key and assign them to a valid key in 9.1.0 and 9.5.1